A legacy of delivering complex infrastructure across India — from highways to housing, electrical networks to marine works.
Construction of access-controlled four laning with paved shoulders from Design Ch. Km 144+900 near Hemmige village to Ch. Km 169+000 near SH-86 junction in Hunsur, Karnataka.
Four laning of SH-37 from Km 37+400 to Km 108+400, Tamil Nadu, under TNRSP-II on Design, Build, Finance, Operate, Maintain and Transfer basis on Modified Annuity mode.
Road improvement works for the Yelahanka to Andhra Pradesh border stretch of SH-09, Bengaluru, Karnataka.
Construction of 4-lane expressway under Bharatmala Pariyojana on Hybrid Annuity Mode, Tamil Nadu.
Roads, road-side drains, cross drainage, storm water drains, rain water harvesting, protection works and utilities (water supply, UGD & electrical) for Sector-8, Bengaluru.
Proposed construction of General Hospital Building & Staff Quarters on Plot CTS No. 11A/4, Sangharsh Nagar, Kurla, Mumbai.
Construction of a 34-storey high-rise with 4-level podium parking (Type V & VI) judicial housing complex at Mazgaon, Mumbai.
Phase-wise redevelopment of the Management Development Centre at Borivali (West), Mumbai.
Construction using Prefabricated Concrete Technology on Lump-Sum Turnkey basis including water supply, sanitary, electrification and development works at Periyar Nagar, Navalar Nedunchezhiyan Nagar and BRN Garden, Chennai.
Construction using Prefabricated Concrete Technology on Lump-Sum Turnkey basis with all services at Andimaniyam Thottam, Gandhi Nagar and Goyathoppe, Chennai.
Construction of quarters for 166 DSP, 1,190 SI/INS and 1,317 PC/HC equivalent personnel at Melakkottaiyur, Kancheepuram District.
Construction of 1BHK (120), 2BHK (600) and 3BHK (60) affordable housing units at Sy. No.03 of Doddabanahalli, Bangalore East Taluk on Lump-Sum Turnkey basis (Phase II).
Proposed construction of housing scheme at Sheik Roza, Gulbarga, Karnataka.
Multi-storey residential housing with layout electrification, water supply, roads, drains, solar lighting, lifts, DG backup and 5-year maintenance under BBMP/BDA/BMRDA areas on Turnkey (PDBOT) basis.
Planning, designing and construction of flat-type high-rise buildings with commercial units and all on-site infrastructure for Economical Weaker Section (EWS) at Belavali, Badlapur.
Construction of 1,000 multi-storied residential flats utilising maximum FSI under EPC system at Sholinganallur, Kancheepuram District, Tamil Nadu.
Construction of 150 3BHK, 220 2BHK and 116 EWS Houses on Design & Build basis with full internal/external development, electrification, UGRs, STP and ESS — a Turnkey project.
Construction of 342 MIG (B+S+1G in 2 blocks) and 114 MIG (S+19 Floors in 1 block) flats at Nerkundram Phase-II, Thiruvallur District under Self Finance Scheme.
Construction of 1,183 MSB EWS Flats (Group V) and 1,040 MSB EWS Flats (Group IV) in multiple block types at Ernavoor, Chennai.
Three turnkey housing projects at Vasant Kunj: 40 3BHK + 60 2BHK (Masoodpur), 76 3BHK + 111 2BHK + 58 EWS (Pocket D-6) and 486 units (Pocket D-7 & D-8) with full infrastructure.
Establishment of Industrial Housing Facility (Dormitory) for employees of Foxconn Hon Hai Technology India at SIPCOT Industrial Park, Vallam Vadagal, Sriperumbudur, Kancheepuram District (Group 1).
Creating electrical infrastructure by extending 11KV HT lines, erecting 25KVA BEE 3-star rated distribution transformers and LT 3-phase 4-wire lines for unauthorised IP sets.
Total turnkey provision of electrical infrastructure under a 2-year rate contract in Chitradurga and Davanagere Divisions, extending 11KV HT lines, 25KVA transformers and LT 3-phase 4-wire lines.
Providing 11KV & LT cable distribution network and establishing a 3×31.5 MVA 66/11KV substation at Sampigehalli village for the entire Arkavathy Layout.
Execution of CAPEX works (action plan) and revenue budget works in Chitradurga Division on total/partial turnkey basis (DTs supplied by BESCOM) for two years.
Conversion of overhead lines to underground cables for 11KV feeders, new feeder bifurcation, LT overhead-to-UG conversion, LT feeder pillar boxes, RMUs and allied works on total turnkey basis.
Execution of CAPEX and revenue budget works under Fixed Price Contracts in Kunigal Division and Magadi Division on total/partial turnkey basis.
Multi-village water supply to Santhemuddapura & 164 habitations (Jagalur Taluk), Bathi, Hebbal & 18 habitations (Davangere Taluk) and bulk water supply to Kondajji & 10 habitations (Harihara Taluk).
Remodelling (modernisation) of canal network from Km 0 to 34 including CC lining using paver and improvement of structures under Shivamoga Package 1.
Remodelling of Y-alignment from Km 15.727 to 21.175 and Tumkur Branch Canal from Km 0 to 70 with CC lining using paver and improvement of structures.
Formation of a new reservoir near Kannankottai and Thervaikandigai villages in Gummidipoondi Taluk, Thiruvallur District, Tamil Nadu.
Modernisation of Tunga Left Bank Canal (Km 34–101.6) and Tunga Right Bank Canal (Km 26–53.8) with 57 distributaries, CC lining and structural improvements.
Development of a dedicated jetty for Lakshadweep with allied infrastructure facilities for cargo and cruise terminals at Old Mangalore Port.
Construction of groin fields at Ottamassery, Kattoor-Pollethai, Kakkazham (Ambalappuzha) and Nellanickal (Vattachal) under KIIFB-KIIDC to protect severely eroded coastal areas.
KIIFB-funded construction of 21 groynes at Arattupuzha, groynes at Ambalapuzha (CESCP 645–672), 13 groynes at Pathiyankara, groyne at Kattoor and 16 groynes at Vattachal, Kerala.
KIIFB FSH007-01: Civil works for the construction of Chethy Fishing Harbour in Alappuzha District, Kerala.
Construction of flood protection wall, chain-link fencing and improvements to the Coovum Canal under the JNNURM Scheme, Chennai.
Remodelling of primary and secondary storm water drains, culverts and bridges (~43 nos.) under BBMP SWD Action Plan Works 2016–17, Bengaluru.
Construction/remodelling of primary, secondary and tertiary drains, bridges and culverts across Jayangara, BTM Layout, Yelahanka and Byatarayanapura constituencies under Chief Minister Nava Nagarothana Yojane.
Construction/remodelling of primary and secondary drains, culverts/bridges and allied SWD works at various locations in Byatarayanapura under GOK Grant 2022–23 (Action Plan nos. 199–205), Package 1.