PROJECT #01
Roads & Highways
4-Laning of Mysore–Kushalnagara Section, NH-275 (Package III)

Construction of access-controlled four laning with paved shoulders from Design Ch. Km 144+900 near Hemmige village to Ch. Km 169+000 near SH-86 junction in Hunsur, Karnataka.

PROJECT #11
Roads & Highways
4-Laning of Oddanchatram–Dharapuram–Avinashipalayam, SH-37 (DBFOMT)

Four laning of SH-37 from Km 37+400 to Km 108+400, Tamil Nadu, under TNRSP-II on Design, Build, Finance, Operate, Maintain and Transfer basis on Modified Annuity mode.

PROJECT #25
Roads & Highways
Improvements to Yelahanka–AP Border Road, SH-09

Road improvement works for the Yelahanka to Andhra Pradesh border stretch of SH-09, Bengaluru, Karnataka.

PROJECT #39
Roads & Highways
4-Lane Bangalore–Chennai Expressway (Kancheepuram to Sriperumbudur)

Construction of 4-lane expressway under Bharatmala Pariyojana on Hybrid Annuity Mode, Tamil Nadu.

PROJECT #05
Roads & Highways
Formation of Sites & Roads with Utilities — Sector 8, Dr K. Shivarama Karantha Layout

Roads, road-side drains, cross drainage, storm water drains, rain water harvesting, protection works and utilities (water supply, UGD & electrical) for Sector-8, Bengaluru.

PROJECT #03
Buildings & Housing
General Hospital Building & Staff Quarters — Chandivali, Mumbai

Proposed construction of General Hospital Building & Staff Quarters on Plot CTS No. 11A/4, Sangharsh Nagar, Kurla, Mumbai.

PROJECT #06
Buildings & Housing
Judicial Housing Complex — Mazgaon, Mumbai (34-Storey, 4-Level Podium Parking)

Construction of a 34-storey high-rise with 4-level podium parking (Type V & VI) judicial housing complex at Mazgaon, Mumbai.

PROJECT #07
Buildings & Housing
Redevelopment of Management Development Centre — Borivali (W), Mumbai

Phase-wise redevelopment of the Management Development Centre at Borivali (West), Mumbai.

PROJECT #09
Buildings & Housing
1,410 Tenements Using Precast Concrete Technology — PMAY (AHP), Chennai

Construction using Prefabricated Concrete Technology on Lump-Sum Turnkey basis including water supply, sanitary, electrification and development works at Periyar Nagar, Navalar Nedunchezhiyan Nagar and BRN Garden, Chennai.

PROJECT #10
Buildings & Housing
1,526 Tenements Using Precast Concrete Technology — PMAY (AHP), Chennai

Construction using Prefabricated Concrete Technology on Lump-Sum Turnkey basis with all services at Andimaniyam Thottam, Gandhi Nagar and Goyathoppe, Chennai.

PROJECT #13
Buildings & Housing
1,673 Houses for Police, Fire & Prison Dept. — Own Your House Scheme, Kancheepuram

Construction of quarters for 166 DSP, 1,190 SI/INS and 1,317 PC/HC equivalent personnel at Melakkottaiyur, Kancheepuram District.

PROJECT #16
Buildings & Housing
Affordable Housing (780 units — 1, 2 & 3 BHK) — Doddabanahalli, Bengaluru

Construction of 1BHK (120), 2BHK (600) and 3BHK (60) affordable housing units at Sy. No.03 of Doddabanahalli, Bangalore East Taluk on Lump-Sum Turnkey basis (Phase II).

PROJECT #20
Buildings & Housing
Housing Scheme — Sheik Roza, Gulbarga

Proposed construction of housing scheme at Sheik Roza, Gulbarga, Karnataka.

PROJECT #21
Buildings & Housing
Multi-Storey Residential Complex — 1 Lakh Homes Programme, Muddayyana Palya, Bengaluru

Multi-storey residential housing with layout electrification, water supply, roads, drains, solar lighting, lifts, DG backup and 5-year maintenance under BBMP/BDA/BMRDA areas on Turnkey (PDBOT) basis.

PROJECT #27
Buildings & Housing
2,298 EWS High-Rise Flats with Commercial Units — Belavali, Badlapur

Planning, designing and construction of flat-type high-rise buildings with commercial units and all on-site infrastructure for Economical Weaker Section (EWS) at Belavali, Badlapur.

PROJECT #29
Buildings & Housing
1,000 Multi-Storied Residential Flats — Sholinganallur, Chennai

Construction of 1,000 multi-storied residential flats utilising maximum FSI under EPC system at Sholinganallur, Kancheepuram District, Tamil Nadu.

PROJECT #31
Buildings & Housing
486 Houses (3BHK / 2BHK / EWS) — Vasant Kunj, Pocket D-7 & D-8

Construction of 150 3BHK, 220 2BHK and 116 EWS Houses on Design & Build basis with full internal/external development, electrification, UGRs, STP and ESS — a Turnkey project.

PROJECT #33
Buildings & Housing
456 MIG Multi-Storied Flats — Nerkundram Phase II, Chennai

Construction of 342 MIG (B+S+1G in 2 blocks) and 114 MIG (S+19 Floors in 1 block) flats at Nerkundram Phase-II, Thiruvallur District under Self Finance Scheme.

PROJECT #34–35
Buildings & Housing
2,223 EWS Flats (Stilt + 13 Floors) — Ernavoor, Chennai (Groups IV & V)

Construction of 1,183 MSB EWS Flats (Group V) and 1,040 MSB EWS Flats (Group IV) in multiple block types at Ernavoor, Chennai.

PROJECT #42–44
Buildings & Housing
Multiple Turnkey Housing Schemes — Vasant Kunj (Pockets D-6, C, D-7 & D-8)

Three turnkey housing projects at Vasant Kunj: 40 3BHK + 60 2BHK (Masoodpur), 76 3BHK + 111 2BHK + 58 EWS (Pocket D-6) and 486 units (Pocket D-7 & D-8) with full infrastructure.

PROJECT #45
Buildings & Housing
Industrial Dormitory for Foxconn — SIPCOT Industrial Park, Sriperumbudur

Establishment of Industrial Housing Facility (Dormitory) for employees of Foxconn Hon Hai Technology India at SIPCOT Industrial Park, Vallam Vadagal, Sriperumbudur, Kancheepuram District (Group 1).

PROJECT #14
Electrical
11KV HT Lines & Distribution Transformers — Ranebennur & Haveri, Karnataka

Creating electrical infrastructure by extending 11KV HT lines, erecting 25KVA BEE 3-star rated distribution transformers and LT 3-phase 4-wire lines for unauthorised IP sets.

PROJECT #26
Electrical
Electrical Infrastructure for Unauthorised IP Sets — Chitradurga & Davanagere Divisions (2-year Rate Contract)

Total turnkey provision of electrical infrastructure under a 2-year rate contract in Chitradurga and Davanagere Divisions, extending 11KV HT lines, 25KVA transformers and LT 3-phase 4-wire lines.

PROJECT #28
Electrical
Electrical Distribution Network & 66/11KV Substation — Arkavathy Layout, Bengaluru

Providing 11KV & LT cable distribution network and establishing a 3×31.5 MVA 66/11KV substation at Sampigehalli village for the entire Arkavathy Layout.

PROJECT #38
Electrical
CAPEX / Action Plan Works — Chitradurga Division (2-year Contract)

Execution of CAPEX works (action plan) and revenue budget works in Chitradurga Division on total/partial turnkey basis (DTs supplied by BESCOM) for two years.

PROJECT #48
Electrical
System Improvement — 11KV UG Cable Conversion, Davanagere Town (Lot-1)

Conversion of overhead lines to underground cables for 11KV feeders, new feeder bifurcation, LT overhead-to-UG conversion, LT feeder pillar boxes, RMUs and allied works on total turnkey basis.

PROJECT #49–50
Electrical
CAPEX Works — Kunigal & Magadi Divisions (2-year Contracts)

Execution of CAPEX and revenue budget works under Fixed Price Contracts in Kunigal Division and Magadi Division on total/partial turnkey basis.

PROJECT #02
Irrigation & Water
Multi-Village Water Supply Scheme — 183+ Habitations, Davangere District (Jal Jeevan Mission)

Multi-village water supply to Santhemuddapura & 164 habitations (Jagalur Taluk), Bathi, Hebbal & 18 habitations (Davangere Taluk) and bulk water supply to Kondajji & 10 habitations (Harihara Taluk).

PROJECT #18
Irrigation & Water
Modernisation of Tunga Anicut Canal Network — Km 0 to 34 (Package 1), Shimoga

Remodelling (modernisation) of canal network from Km 0 to 34 including CC lining using paver and improvement of structures under Shivamoga Package 1.

PROJECT #23
Irrigation & Water
Remodelling of Hemavathy Project — Y-Alignment & Tumkur Branch Canal (Km 0 to 70)

Remodelling of Y-alignment from Km 15.727 to 21.175 and Tumkur Branch Canal from Km 0 to 70 with CC lining using paver and improvement of structures.

PROJECT #30
Irrigation & Water
Formation of New Reservoir — Kannankottai & Thervaikandigai, Thiruvallur District

Formation of a new reservoir near Kannankottai and Thervaikandigai villages in Gummidipoondi Taluk, Thiruvallur District, Tamil Nadu.

PROJECT #37
Irrigation & Water
Modernisation of Tunga Anicut Canal Network — Km 34 to 101.6 (Package 2)

Modernisation of Tunga Left Bank Canal (Km 34–101.6) and Tunga Right Bank Canal (Km 26–53.8) with 57 distributaries, CC lining and structural improvements.

PROJECT #04
Marine & Coastal
Dedicated Jetty for Lakshadweep — Cargo & Cruise Terminal, Old Mangalore Port

Development of a dedicated jetty for Lakshadweep with allied infrastructure facilities for cargo and cruise terminals at Old Mangalore Port.

PROJECT #08
Marine & Coastal
Groin Fields in Severely Eroded Coastal Belt — 4 Locations, Alappuzha District

Construction of groin fields at Ottamassery, Kattoor-Pollethai, Kakkazham (Ambalappuzha) and Nellanickal (Vattachal) under KIIFB-KIIDC to protect severely eroded coastal areas.

PROJECT #32 & #40
Marine & Coastal
Construction of Groynes at Multiple Locations — Alappuzha, Ambalapuzha & Arattupuzha

KIIFB-funded construction of 21 groynes at Arattupuzha, groynes at Ambalapuzha (CESCP 645–672), 13 groynes at Pathiyankara, groyne at Kattoor and 16 groynes at Vattachal, Kerala.

PROJECT #41
Marine & Coastal
Chethy Fishing Harbour — Civil Works, Alappuzha District

KIIFB FSH007-01: Civil works for the construction of Chethy Fishing Harbour in Alappuzha District, Kerala.

PROJECT #12
Drainage & SWD
Flood Protection Wall & Coovum Canal Improvements — Chennai (JNNURM)

Construction of flood protection wall, chain-link fencing and improvements to the Coovum Canal under the JNNURM Scheme, Chennai.

PROJECT #15
Drainage & SWD
Remodelling of SWD Primary & Secondary Drains — 43 Culverts/Bridges, Bengaluru (BBMP 2016–17)

Remodelling of primary and secondary storm water drains, culverts and bridges (~43 nos.) under BBMP SWD Action Plan Works 2016–17, Bengaluru.

PROJECT #51–53
Drainage & SWD
SWD Remodelling — Jayangara, BTM Layout, Yelahanka & East Zones (CMNNY Scheme 2019–20)

Construction/remodelling of primary, secondary and tertiary drains, bridges and culverts across Jayangara, BTM Layout, Yelahanka and Byatarayanapura constituencies under Chief Minister Nava Nagarothana Yojane.

PROJECT #54–55
Drainage & SWD
SWD Remodelling — Byatarayanapura Assembly Constituency (GOK Grant 2022–23)